You are here

More details of State Route 103 corridor safety study

Public comment sheet attached; study project cost $65,420

The safety study underway on Bluffton’s 103 corridor is the first step in possible improvements made to that two-lane heavily-trafficked area of the community.

Bluffton residents are encouraged to share their comments on the study.

A printer-friendly comment sheet is attached at the bottom of this story.  All comments must be delivered to the town hall village office by Wednesday, Sept. 28.

The Icon obtained additional information about the project following its story posted Sept. 22. CLICK HERE to read that story.

Attached are portions the Choice One Engineering document shared during a Sept. 13 public meeting.

The document shows:
• a photo of the study area,
• the study’s purpose and need,
• project background
• safety summary
• collision diagram
• considerations for improvement
• next steps in the study

Section: