Made in Bluffton
Students in Todd Boblitt’s Bluffton High School Civil Engineering and Architecture class are installing a 12- by 16-foot storage building that class members designed. The building will be used to store equipment near the Ricky Matter Center. The class hand sketched ideas, designed the structure, 3D modeled, ran a cost analysis, surveyed the land, and is now constructing the shed. The shed is framed and members will continue finishing it over the next couple weeks. (Photos from BlufftonPirates.com Facebook)
Stories Posted This Week
Monday, September 21, 2026
Sunday, September 20, 2026
Saturday, September 19, 2026
Friday, September 18, 2026
- Bluffton welcomes incoming class from nine states
- September 2026 Bluffton Lions Club update
- Pirate volleyball sweeps Lima Central Catholic
- Pirate boys soccer win vs. Kenton
- Ramseyer shares grandmother’s fight for citizenship during Bluffton Constitution Day Forum
- How Dillinger robbed a Bluffton bank