New hospital generator now on site

New Emergency Department

oFireproofing is complete
oTemporary windows are installed to enclose the area for winter work
oBrick installation continues in the front Emergency Department entry
oWork continues on interior metal studs, insulation and dry wall
oWork continues on HVAC, electrical and plumbing rough in
oWood blocking for fixtures continues to be installed

Lot behind the hospital
oThe new generator arrived Dec. 14 and the old boilers were removed

New Surgery Area
oMedical gas piping is in the finishing stages
oMetal stud and drywall work continues for interior walls

Exterior Site
oMuch of the remainder of the exterior site work will resume in the spring

For your safety and that of our contractors, all associates and visitors are to refrain from entering the work site at any time without prior authorization and without appropriate safety equipment.