2022 resurfacing of portion of U.S. 30 proposed
The Ohio Department of Transportation is proposing to resurface a portion of U.S. 30 in Allen County in the summer of 2022.
Resurfacing is proposed from the railroad bridges located approximately one-half mile east of the State Route 65 interchange, just south of the Village of Cairo, to the ramps at the U.S. 30 and S.R. 696 interchange near the Village of Beaverdam.
All work will occur within the existing roadway right of way.
Traffic detours are not anticipated during construction.
Stories Posted This Week
Tuesday, June 30, 2026
Monday, June 29, 2026
- Ada Icon headlines, Jun 29
- Lima Meijer closed on June 29 following shots fired
- Ohio EMA tips for extreme heat conditions this week
- Scavenger hunt at Senior Center
- Bluffton University streamlines MBA program for working professionals
- July 2026: What brings you to Bluffton?
- America 250 Quilt Raffle is underway
- More than a car show: 58th annual Festival of Wheels
- Allen County residents invited to provide feedback on Hazard Mitigation Plan