State Route 103 road work scheduled
Ohio Department of Transportation announces the following road project affecting Bluffton area drivers:
• State Route 103 between county Road 9 and township Road 65, between the villages of Jenera and Arlington, will close May 23 for approximately 30 days for a culvert replacement.
Traffic will be detoured onto U.S. 68, U.S. 30 and state Route 235 back to state Route 103. Work is being performed by Miller Contracting Group, Ottoville. (see map)
• State Route 103 between township Road 70 and township Road 177 in the village of Arlington will be restricted to one lane through the work zone for a repaving project that will resume May 7. Work is being performed by M&B Asphalt, Tiffin.
• Berm repair will restrict traffic to one lane along State Route 103 between Bluffton and the Wyandot County line. Work is being performed by the ODOT Hancock County maintenance garage.
Stories Posted This Week
Monday, May 19, 2025
- James Michael Augsburger was a tool and die maker
- Summer Read program invites participants to Color Our World
- Trinity Lutheran graduation ceremonies on May 25
- Bluffton American Legion Post #382 invitation to 2025 Memorial Day activities
- Letter: Navigating Physician Shortages – What This Means to You
Sunday, May 18, 2025
Saturday, May 17, 2025
Friday, May 16, 2025
- Hazardous weather on the evening of May 16
- Garth L. Lugibihl was a dairy farmer
- Pirates advance 3 in tennis sectionals
- Pirate softball falls to O-G rally in sectionals
- Pirate baseball edged by Hardin Northern
- Transfer of Harrod Veterinary Clinic patient files
- Drawing inspiration from eight Bluffton photos